Business Jepae designs and builds various business infrastructures.

Steel pipe pile method

Preparation of construction plan
According to the design (quality control, process control) consulted with the contractor. Flat pile arrangement foundation type pile core
Material supply
Design(steel pipe part). Steel pipe material, length, thickness, outer diameter
Field input
Depends on construction (steel pipe part). Steel pipe material, length, thickness, outer diameter
Heavy machinery input
According to the construction design. Suitable for the length and outer diameter
Pile construction
According to the construction design, check the construction order and management figures
Measuring construction result
Check the depth of the tip if it reaches the support layer. Check the positions of the pile core and the reinforcement
Report
Attach photos of the construction. Record the actual site after construction